Cutaway drawing RAF general service pinnace 4195 on the hard being grit blasted Transom removed Stars from Wessex Resins helping us for the day Sheathing below the waterline Fairing the topsides Hull and fordeck sheathing complete Hold complete & canvas off Rubbing strakes to chine and distinctive six inch band Painting started All complete up to the gumwale All the internals were stripped and gritblasted Hold after painting Rudders and props on And to the transom Preparing to crane in 38 months after we had lifted her out Gunwale rubbing stakes going on Rounding up the mast All done Finally located the correct portholes for the hold Original horn and spotlight Wheelhouse bulkhead and instrument panel Watertight door opening to engineroom Varnish work in progress